Following the devastating bushfires of February 2009, together with Urban Design we were commissioned to design the new Community Hub at Callignee to replace the hall lost in the fires. The project was designed in close collaboration with the community, including a three day on-site design studio with the community.

Completed in early 2011, the Hub is planned as a series of interconnected pavilions, comprising two community halls, a CFA engine shed, child care facilities and a cricket pavilion. A number of ESD initiatives have been incorporated into the project using donations from Alstom.1193_callignee (14)_with grass

 

 