Leongatha Site Masterplan

Murray Goulburn Co-operative Co. Ltd

The Leongatha site has grown over 90 years in a piecemeal manner with some buildings and infrastructure nearing the end of its useful life. We completed a thorough site audit and survey of the site prior to preparing a 10 year site master plan. The developed master plan allows for a systematic expansion of the site and removal and renewal of old buildings and site infrastructure. The developed master plan formed the basis of establishing a Development Plan Overlay (DPO).  With the support of the state and local government the DPO provides security of development of the site. We assisted with and coordinated the preparation of the DPO documents.

 

Kiewa Site Masterplan

Danone Murray Goulburn

Danone and Murray Goulburn entered into a joint venture to produce the Activia range of yoghurts. A redundant cheese manufacturing building at the Murray Goulburn site was to be refurbished as a yoghurt facility. We assisted Danone in preparing a site master plan to allow the new facility to be established and grow within the confines of the site and existing Murray Goulburn operations. We subsequently documented and administered the construction of the first two stages of this master plan

1096_Waterworld, MGC (17)1096_Waterworld, MGC (2)

 

%d bloggers like this: